fbpx

FULL KITCHEN MAKEOVER PACKAGE

Full Kitchen Makeover PackageFull Kitchen Makeover Package
3/4/5 Room Full Kitchen Makeover Package - $13,888 

FULL KITCHEN MAKEOVER PACKAGE INCLUDES

professional designer

Professional Design Services

  • DESIGN CONSULTATION & SPACE PLANNING
  • DESIGN PROPOSAL & 3D PERSPECTIVE DRAWING
  • PROPOSAL OF COLOUR, MATERIAL & ACCESSORIES
  • 3D VISUAL PERSPECTIVE PRESENTATION
  • PROJECT MANAGEMENT/SITE INSPECTION/WORK SCHEDULE
  • LIFETIME AGENT WARRANTY FOR ALL CARPENTRY HARDWARE MECHANISM
  • 5 YEARS WARRANTY WITH GUARANTEED AFTER SALES SERVICE
  • COMPLIMENTARY LOAN/INSURANCE CONSULTANCY (24MTHS REPAYMENT PLAN )
  • NECESSARY AUTHORITY PERMIT APPLICATION
plasterceil plastering work

Masonry Works

  • SUPPLY & CONSTRUCT 50MM HEIGHT THICK CEMENT MORTAR KITCHEN CABINET BASE C/W SIDE TILES
  • HACK EXISTING FLOOR FINISH AT KITCHEN AREA
  • HACK EXISTING WALL FINISH AT KITCHEN AREA
  • DISMANTLE EXISTING KITCHEN CABINET
  • DEMOLISH EXISTING SINK/STOVE SUPPORT
  • DEMOLISH EXISTING MOTOR BASE
plumbing work

Plumbing Works

  • PROVIDE LABOUR TO INSTALL KITCHEN SINK AND SINK TAP
  • LAYING OF CONCEAL PVC DRAINAGE PIPE FOR KITCHEN SINK (IF APPLICABLE)
  • LAYING OF CONCEAL PVC DRAINAGE PIPE FOR WASHING MACHINE (IF APPLICABLE)
  • SUBMISSION TO SP/PUB FOR ENDORSEMENT ( IF APPLICABLE )
carpentry work

Carpentry Works

  • FABRICATE & INSTALL TOP & BOTTOM KITCHEN CABINET IN HIGH QUALITY LAMINATE FINISHING @ 20FT WITH ABS TRIMMING
  • SUPPLY & INSTALL “304 GRADE” 2-TIERS STAINLESS STEEL DISH RACKS
  • SUPPLY & INSTALL 1 SET OF FROSTED GLASS DOOR PANEL C/W HYDRAULIC SYSTEM
  • SUPPLY & INSTALL CHEST OF 3 DRAWERS C/W 1 SET OF CUTLERY TRAY
  • SUPPLY LABOUR TO INSTALL COOKER HOOD & HOB
  • 3 SETS OF BLUM/EXCEL SOFT CLOSING TANDEM RUNNER
  • 1 SET OF BLUM AVENTOS HK/EXCEL CONSTANZO LIFT UP SYSTEM
  • BLUM SOFT CLOSE HINGES/EXCEL SUS304 SOFT CLOSE HINGES FOR ALL CASEMENT DOORS
  • 3 SETS OF BLUM/EXCEL SOFT CLOSING TANDEM RUNNER
  • PROVIDE LABOUR TO INSTALL DOOR HANDLES 
electrical work

Electrical Works

  • REINSTATE 2 SETS OF LIGHTING POINT AT KITCHEN
  • REINSTATE 2 SETS OF 13A X SINGLE POWERPOINT AT KITCHEN
  • LABOUR TO INSTALL LIGHTS AT KITCHEN EXISTING LIGHTING POINT
  • INSTALL 1 SET OF COOKER HOOD POINT
  • REINSTATE 2 SETS OF 13A X DOUBLE POWERPOINT AT KITCHEN

Worktop Works

  • SUPPLY CUSTOM-MADE & INSTALL QUARTZ WORKTOP TOTAL SIZE @ 10FT INCLUDES VARIOUS PROFILE FINISHES

Painting Works

  • PAINTING OF KITCHEN CEILING USING NIPPON ANTI MOULD PAINT
  • PAINTING OF SEWAGE PIPE USING NIPPON PAINT

Miscellaneous Works

  • SUPPLY & LAY CORRUGATED CARDBOARD/FIBRE BOARD FOR WHOLE UNIT TO PROTECT EXISTING FLOORING
  • TO PROVIDE HAULAGE OF BUILDING MATERIALS
  • CLEARING OF DEBRIS OFF RENOVATION SITE AND DISPOSE AT AN NEA APPROVED FACILITY
  • CHEMICAL WASH & GENERAL CLEANING UPON COMPLETION OF WORKS
  • CLEARING OF OLD HOOB and HOB

Free Gifts

  • FREE VALENTI COOKER HOB MODEL
  • FREE VALENTI COOKER HOOD MODEL
  • FREE STAINLESS STEEL KITCHEN SINK WITH 10 YEARS WARRANTY
  • FREE SINGLE LEVER SINK FAUCET
© 2020 Honeycomb Design Studio Pte Ltd. Reg. No. 201915234G. All rights reserved.
Contact Us
WhatsApp Now
Do NOT follow this link or you will be banned from the site! pinterestenvelopewhatsapp linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram